Refurbished Endura 5500 System
ATS(Advanced Technology Supplier), Inc. is providing you with fully refurbished AMAT Endura 5500 System base on your Specification.

According to Standard working procedure, skillful Engineers are working efficiently.
- Remove whole chambers and source assembly
- Wet Cleaning the system
- Overhaul whole cryo pumps in OEM Korean Branch
- Overhaul all power supplies in OEM Korean Branch
- Overhaul all MFCs in OEM Korean Branch
- Assemble the system base on Customer Specification
- Turn-On the system power and Finish Tier 1
- Final Test
- Customer Audit


ATS(Advanced Technology Supplier), Inc. supplies daily report for refurbishment & Setup on time.
We hand on all data sheet after final test when you visit for audit the system before shipping.
In case of installation at the customer site, you would see the best engineers during Tier 1 & Tier 2.
   - it is normal to finish installation(Tier 1 & 2) within 2 weeks if facilities are ready
Copyright¨Ï2008 Advanced Technology Supplier, Inc. All rights reserved. | About | Contact Us |
673-12,13 MyoBong-Ri, YiDong-Myun, CheoIn-Gu, YongIn-City, GyeongGi-Do, Korea 449-832